Week 1


               
-The first week on the job was the toughest week of the summer.  The importance of this week was to get
  everything cleaned and prepared for opening the outdoor pool for the
summer.  With over 400 pieces of
furniture that needed to be pressure-washed as well as the entire concrete pool
deck.  This was a long process due
to only having access to three pressure washers and limited employees.  Between Mike, Cory, Kevin, and myself
we had to prepare everything to get the pool ready for summer use. 
After all furniture was washed as well as the deck we located chairs and
tables to their specific locations. 
This was by far the most manual labor I conducted of the summer.  Although cleaning the soccer field was
the second toughest.  Once we had
everything placed and set up Friday afternoon, we were satisfied as well as the
General Manager.  The pool was
ready to be open.  With all the
regulations a company came in to install the diving board and ladders to enter
and exit the swimming area.